Search Criteria

NSN/NIIN No.:
Part No. :
(13-16 digit NSN/9 digit NIIN)
2915-00-563-48022915-00-563-4800
NSNDescriptionAssign Date
2915-00-563-4801SHIELD,HEAT INLET,A01/01/1963
NSNDescriptionDetailOpen Solicitations
2915-00-563-4801SHIELD,HEAT INLET,A0
Part NumberDescriptionCompanyQuantity
358204SHIELD,HEAT INLET,A ALAMO AIRCRAFT, LTD.2
358204SHIELD,HEAT INLET,A ALAMO AIRCRAFT, LTD.36
358204BRACKET SHORELINE AEROSPACE LLC1
358204SHIELD,HEAT INLET,A POSITEX INC508
For additional information Register for Free Trial
Part NumberCompanyCAGE
358204RTX CORPORATION77445
For additional information Register for Free Trial
CodeDefinition
ACQUISITION METHOD CODE.
'All Departments3ACQUIRE DIRECTLY FROM THE ACTUAL MANUFACTURER, WHETHER OR NOT THE PRIME CONTRACTOR IS THE ACTUAL MANUFACTURER.
ACQUISITION METHOD SUFFIX CODE.
'All DepartmentsCTHIS PART REQUIRES ENGINEERING SOURCE APPROVAL BY THE DESIGN CONTROL ACTIVITY IN ORDER TO MAINTAIN THE QUALITY OF THE PART. AN ALTERNATE SOURCE MUST QUALIFY IN ACCORDANCE WITH THE DESIGN CONTROL ACTIVITY’S PROCEDURES, AS APPROVED BY THE COGNIZANT GOVERNMENT ENGINEERING ACTIVITY. VALID AMCS: 1, 2, 3, 4 AND 5.
MAJOR ORGANIZATIONAL ENTITY.
Air ForceDFAir Force
NavyDNNavy
Defense Logistics Agency.DSDefense Logistics Agency.
PRICE
All DepartmentsPrice515.21
PRECIOUS METALS INDICATOR CODES.
All DepartmentsAItem does not contain Precious Metal.
CRITICALITY CODE.
All Departments
AUTOMATIC DATA PROCESSING EQUIPMENT.
All Departments
ELECTROSTATIC DISCHARGE CODE.
All Departments
HAZARDOUS MATERIALS INDICATOR CODE.
All DepartmentsNIndicates there is no data in the HMIRS and the NSN is in a FSC not generally suspected of containing hazardous materials.
DEMILITARIZATION CODE.
All DepartmentsQCommerce Control List Items (CCLI) – Mutilation to the point of scrap required outside the United States. In the United States, mutilation requirement determined by the DEMIL Integrity Code. DoD Trade Security Controls (TSC) required in the United States. (Note 8).
For additional information Register for Free Trial
SHIELD, HEAT INLET, AIRCRAFT GAS TURBINE ENGINE ADDENDUM/EXCEPTION TO P/N 358204 IS AS FOLLOWS: USE DCS-48 FOR INSPECTION OF DIE STAMPING. USE VIS-46 FOR IMPERFECTIONS IN DIE FORMING OF SHEET METAL. CONTROLLED MAT'L; AMS 5510 BARE ITEM MARKINGS SHALL BE PER MIL-STD-130N OR LATER, PARA 4, USING THE METHODS SPECIFIED ON THE APPLICABLE DRAWING(S). CONFIGURATION CONTROL APPLIES SEE CLAUSE 52.246-9G36 (SECTION I). AN UNRESTRICTED TECHNICAL DATA PACKAGE IS AVAILABLE AT DSCR FOR THIS NSN.TO OBTAIN A COPY SUBMIT YOUR REQUEST TO DSCR-VABA VIA MAIL: DEFENSE SUPPLY CENTER RICHMOND (DSCR) ATTN:DSCR-VABA RICHMOND, VA 23297-5615, FAX NUMBER: (804) 279-4946,OR PHONE NUMBER: (804) 279-3356. . QUALITY ASSURANCE INSTRUCTIONS FOLLOW......... ARTICLES TO BE FURNISHED HEREUNDER SHALL BE MANUFACTURED, TESTED AND INSPECTED IN ACCORDANCE WITH THE DRAWING REVISION CITED IN THE CONTRACT, ALL DETAILS AND SPECIFICATIONS REFERENCED THEREIN. I. QUALITY/INSPECTION REQUIREMENTS: A. FIRST ARTICLE TESTING APPLIES. B. MANDATORY INSPECTION PARAGRAPH III APPLIES. II. SUPPLEMENTAL REQUIREMENTS: A. THE FIRST ARTICLE OFFERED MUST BE MANUFACTURED AT THE FACILITIES IN WHICH THAT ITEM IS TO BE PROCURED UNDER THE CONTRACT, OR IF THE FIRST ARTICLE IS A COMPONENT NOT MANUFACTURED BY THE CONTRACTOR, SUCH COMPONENT MUST BE MANUFACTURED AT THE FACILITIES IN WHICH THE COMPONENT IS TO BE PRODUCED FOR THE CONTRACT. A CERTIFICATION TO THIS EFFECT MUST ACCOMPANY EACH FIRST ARTICLE WHICH IS OFFERED. B. THE CONTRACTOR SHALL IDENTIFY ON THE PROCESS/OPERATION SHEETS ALL MANUFACTURING SOURCES PERFORMING PROCESSES/OPERATIONS OUTSIDE OF THEIR FACILITIES. THESE SHEETS SHALL NOT BE REVISED OR ALTERED AFTER THE SUCCESSFUL COMPLETION OF FIRST ARTICLE OR PRODUCTION LOT TESTING WITHOUT APPROVAL FROM THE ENGINEERING SUPPORT ACTIVITY VIA THE PCO. C. THE INSPECTION METHOD SHEETS WHICH LIST THE CHARACTERISTICS OF EACH ITEM PRODUCED UNDER THE CONTRACT SHALL HAVE SERIAL NUMBER TRACEABILITY TO THE RAW MATERIAL, OR FORGING. IN ADDITION, THE CONTRACTOR IS RESPONSIBLE FOR PROVIDING COMPLETED INSPECTION METHOD SHEETS SHOWING THE ACTUAL DIMENSIONS TAKEN. D. SEE MIL-HDBK-831 DATED 23 APR. 1999 IN PREPARATION OF THE FIRST ARTICLE TEST AND INCLUDE OBJECTIVE EVIDENCE OF COMPLETE DIMEN- SIONAL INSPECTION AND CHEMICAL/PHYSICAL PROPERTY TESTING INCLUDING COPIES OF ALL CERTIFICATIONS. FOR THE MATERIAL AND PROCESSING PERFORMED AS CITED ON THE DRAWING. THIS REPORT SHALL BE MAILED TO THE GOVERNMENT TESTING ACTIVITY TOGETHER WITH THE FIRST ARTICLE. E. THE FIRST ARTICLE WILL NOT SERVE AS A MANUFACTURING STANDARD. F. MARKINGS SHALL BE I/A/W MIL-STD-130, REVISION K, 15 JAN 2000, UNLESS OTHERWISE SPECIFIED IN THE ORIGINAL EQUIPMENT MANUFACTURER'S DRAWING. III. MANDATORY INSPECTION REQUIREMENTS: DURING FIRST ARTICLE PRODUCTION, MANDATORY INSPECTION IS REQUIRED TO BE ACCOMPLISHED BY THE CONTRACTOR AS FOLLOWS: A. LEVEL OF INSPECTION (LOI). 1. CRITICAL CHARACTERISTICS: 100 PER CENT INSPECTION SHALL APPLY. 2. MAJOR AND MINOR CHARACTERISTICS-LOI SHALL BE I/A/W A SAMPLING PLAN ACCEPTABLE TO THE QAR. B. MAJOR AND MINOR CHARACTERISTICS SHALL BE DEFINED BY THE CONTRACTOR SUBJECT TO QAR CONCURRENCE, UNLESS DEFINED ON APPLICABLE DRAWINGS AND ASSOCIATED SPECIFICATIONS. IV. UNLESS EXPRESSLY PROVIDED FOR ELSEWHERE IN THIS CLAUSE, EQUIPMENT SUCH AS: FIXTURES, JIGS, DIES, PATTERNS, TEMPLATES, MYLARS, SPECIAL TOOLING, TEST EQUIPMENT, OR ANY OTHER MANUFACTURING AID REQUIRED FOR THE MANUFACTURE AND/OR TESTING OF THE SUBJECT ITEM(S) WILL NOT BE PROVIDED BY THE GOVERNMENT OR ANY OTHER SOURCE AND IS THE SOLE RESPONSIBILITY OF THE CONTRACTOR. THE FOREGOING APPLIES NOTWITHSTAND- ING ANY REFERENCE TO SUCH EQUIPMENT OR THE FURNISHING THEREOF THAT MAY BE CONTAINED IN ANY DRAWING OR REFERENCED SPECIFICATION. A. FIRST ARTICLE INSPECTION/TEST CRITERIA: THE FOLLOWING TESTS SHALL BE PERFORMED UNDER THE FIRST ARTICLE APPROVAL CLAUSE OF THE CONTRACT: 1. FORM 2. FIT (INSTALLATION OF PARTS TO ENSURE PROPER MATING WITH THE RELATED COMPONENTS). 3. COMPLIANCE WITH THE DRAWING REVISION CITED IN THE CONTRACT DRAWING, ASSOCIATED DRAWINGS AND SPECIFICATIONS THEREIN, INCLUDING BUT NOT LIMITED TO, DIMENSIONS, MATERIAL, HEAT TREAT, FINISH, AND OTHER REQUIRED PROCESSES. B. QUANTITY OF SAMPLES TO BE SUBMITTED FOR TESTING IS THREE. CONDITIONS FOR WAIVER OF FIRST ARTICLES ARE: 1. OFFERORS WHO HAVE PREVIOUSLY FURNISHED PRODUCTION QUANTITIES OF THE SAME ARTICLE TO THE GOVERNMENT, DOD, AIR FORCE. 2. OFFERORS WHO HAVE PREVIOUSLY FURNISHED PRODUCTION QUANTITIES OF THE SAME ARTICLE TO THE PRIME CONTRACTOR FOR DELIVERY TO THE GOVERNMENT, DOD, AIR FORCE. 3. OFFERORS CURRENTLY IN PRODUCTION OF THE SAME ARTICLE FOR A GOVERNMENT, DOD, AIR FORCE CONTRACT AND WHO HAVE RECEIVED FIRST ARTICLE APPROVAL UNDER THE EXISTING CONTRACT. 4. OFFERORS WHO HAVE PREVIOUSLY FURNISHED PRODUCTION QUANTITIES OF THE SAME ARTICLE TO THE GOVERNMENT, DOD, AIR FORCE PROVIDING ARTICLES THUS FURNISHED HAVE EXHIBITED SATISFACTORY PERFORMANCE IN SERVICE, IN THE OPINION OF THE GOVERNMENT. 5. PROVIDED NOT MORE THAN THIRTY-SIX (36) MONTHS HAVE ELAPSED SINCE COMPLETION OF THE CONTRACT. C. SHIP FIRST ARTICLE EXHIBITS (ONLY) TO: DDOO-SOP (FIRST ARTICLES) BLDG 18 DOOR 16 (405) 739-7667 8080 PERIMETER RD TINKER AFB, OK 73145-8000 DODAAC: FY2303 MARK FOR: FIRST ARTICLES ATTN: DDOO-SOP SHIP FIRST ARTICLE TEST REPORTS/PLANS/AND ANY SUPPORTING CONTRACTOR DATA TO: DODACC:FA8111 OC-ALC/ENRS ATTN: F.A. MONITOR 3001 STAFF DRIVE, STE 2AH66B TINKER AFB, OK 73145-3036 DO NOT POST NON-ACCOUNTABLE DO NOT PUT IN SUPPLY D. NOTIFICATION OF SHIPMENT FOR GOVERNMENT TESTING: 1. FIRST ARTICLE DELIVERY DUE WITHIN NINETY (90) CALENDAR DAYS FROM DATE OF CONTRACT. 2. THIRTY (30) CALENDAR DAYS PRIOR TO SHIPMENT OF FIRST ARTICLE SAMPLES, THE CONTRACTOR SHALL NOTIFY THE TEST FACILITY, IN WRITING OF THE ANTICIPATED SHIPPING DATE, WITH AN INFORMATION COPY TO THE PCO. THE CONTRACTOR SHALL ALSO ARRANGE FOR PRELIMINARY INSPECTION OF TEST SAMPLES BY THE CAO/QAR. 3. UPON SHIPMENT OF FIRST ARTICLE SAMPLES, THREE (3) COPIES OF THE MATERIAL INSPECTION AND RECEIVING REPORT (DD250) BEARING THE QAR SIGNATURE AND INDICATION OF PRELIMINARY INSPECTION, SHALL BE FORWARDED TO THE TEST FACILITY. THE ENVELOPES SHALL BE CLEARLY MARKED: DO NOT OPEN IN MAILROOM. 4. WITHIN NINETY (90) CALENDAR DAYS AFTER RECEIPT OF SAMPLES, THE TEST SITE SHALL COMPLETE TESTING/EVALUATION AND SUBMIT (2) COPIES OF THEIR REPORT WITH CONCLUSIONS AND RECOMMENDATIONS TO PCO. E. DISPOSITION OF FIRST ARTICLES: 1. APPROVED FIRST ARTICLES WILL BE FORWARDED TO DLA SUPPLY. 2. DISAPPROVED FIRST ARTICLES WILL BE RETURNED TO THE CONTRACTOR. END OF QUALITY ASSURANCE INSTRUCTIONS......... DETAIL DRAWING DATA LISTS QUALITY ASSURANCE PROVISIONS SPECIFICATION
Cage# 77445 and PartNumber# 358204
Doc. NumberDoc. TypeDoc. Def.Doc. CodeDoc. DateAmdt. DateCage
PWA355DWGBASICSS07/16/199909/25/2006 77445
DCS-48QAPBASICQA07/26/199509/25/2006 77445
77445 DCS-48QAPBASIC07/26/199509/25/2006
358204DWGBASICDD01/17/196309/23/2006 77445
VIS-46QAPBASICQA09/19/200609/19/2006 77445
PWA310DWGBASICSS05/22/200309/18/2006 77445