Search Criteria

NSN/NIIN No.:
Part No. :
(13-16 digit NSN/9 digit NIIN)
6685-01-336-86677642-01-590-9255
NSNDescriptionAssign Date
6685-01-310-7165THERMOSTAT,FLOW CONTROL11/12/1989
NSNDescriptionDetailOpen Solicitations
6685-01-310-7165THERMOSTAT,FLOW CONTROL0
Part NumberDescriptionCompanyQuantity
199530TUBE WESTERN AIRPARTS CORPORATION3
For additional information Register for Free Trial
Part NumberCompanyCAGE
199530CUMMINS INC.15434
For additional information Register for Free Trial
NameValue
END ITEM IDENTIFICATIONENGINE DSL
For additional information Register for Free Trial
CodeDefinition
ACQUISITION METHOD CODE.
'All Departments3ACQUIRE DIRECTLY FROM THE ACTUAL MANUFACTURER, WHETHER OR NOT THE PRIME CONTRACTOR IS THE ACTUAL MANUFACTURER.
ACQUISITION METHOD SUFFIX CODE.
'All DepartmentsDTHE DATA NEEDED TO PRODUCE THIS ITEM FROM ADDITIONAL SOURCES IS NOT PHYSICALLY AVAILABLE. VALID AMCS: 3, 4 AND 5.
MAJOR ORGANIZATIONAL ENTITY.
NavyDNNavy
Defense Logistics Agency.DSDefense Logistics Agency.
PRICE
All DepartmentsPrice125.66
PRECIOUS METALS INDICATOR CODES.
All DepartmentsAItem does not contain Precious Metal.
CRITICALITY CODE.
All DepartmentsXThe item does not have a nuclear hardened feature or any other critical feature such as tolerance, fit restriction or application.
AUTOMATIC DATA PROCESSING EQUIPMENT.
All Departments
ELECTROSTATIC DISCHARGE CODE.
All Departments
HAZARDOUS MATERIALS INDICATOR CODE.
All DepartmentsPIndicates there is no information in the HMIRS; however, the NSN is in a FSC in Table II of Federal Standard 313 and a MSDS may be required by the user. The requirement for a MSDS is dependent on a hazard determination of the supplier or the intended end use of the product.
DEMILITARIZATION CODE.
All DepartmentsANo-USML/Non-CCLI – No DEMIL or DoD TSC required. Department of Commerce may impose licensing requirements to certain destinations. (Note 9).
For additional information Register for Free Trial
THERMOSTAT,FLOW CON 1. SAMPLING FOR INSPECTION AND TESTING SHALL BE IAW ANSI/ASQ Z1.4-2008, DATED JAN 1, 2008. ANY ALTERNATE PLAN MUST BE APPROVED BY THE PCO. A SAMPLING PLAN THAT ACCEPTS ON ZERO DEFECTS IS REQUIRED 2. ANY DEFECTIVE ITEM DISCOVERED DURING INSPECTION MAY BE CAUSE FOR REJECTION OF THE ENTIRE CONTRACT QUANTITY.